Expert Site Power Services
Different sites need different power. A small renovation might run fine on single phase, while a larger build with cranes, large saws, pumps, or heavy machinery needs three phase to run that equipment safely and reliably.
Palms Electrical sets up both single and three phase temporary site power throughout Sydney's Northern Beaches, matched to what your equipment needs.
Single or Three Phase for Your Site?
The right choice depends on your equipment and how busy the site is.
Consider:
- Light tools run fine on single phase
- Heavy machinery generally needs three phase
- Busy sites with many tools benefit from three phase
- Future heavier stages favour three phase early
- Underpowered supply causes tripping
- The right phase avoids delays
We assess and advise on the best setup.
Site Power Services We Provide
We handle the complete supply, including:
- Single phase temporary site supply
- Three phase temporary site supply
- Power for heavy machinery and equipment
- Correctly rated temporary boards
- Network connection
Everything is built to construction wiring standards.
Flexible Through the Build
If your site's needs change as the build progresses, we can adjust the supply.
This includes:
- Upgrading from single to three phase
- Adding capacity for new equipment
- Relocating the supply
- Adapting to new build stages
So your power always suits the job.
Power That Suits the Job
We take the time to understand what your site needs to run, now and through the build, all backed by a lifetime labour warranty.